Medical Projects
Dodd Hall
The Ohio State University Wexner Medical Center, Columbus OH
Design and management for replacement of the chiller plant at OSU’s Wexner Medical campus. Installation was completed in stages so that there was always a chiller operable to maintain air quality for the hospital.
- (2) new 242-ton chillers
- (2) new cooling towers
- refrigerant monitoring
- new BAS controls
PPE Facility | KN95 Masks
Phoenix Quality Manufacturing, Jackson OH
Construction of a new 24,000 SF PPE manufacturing facility for production of KN95 masks following FDA guidelines. The design-build team was organized at the start of the COVID-19 pandemic for the fast-track design and build of the facility to help supply personal protection equipment. The facility went from concept to product manufacturing in under 8 months. Upon completion, Lt Governor Jon Husted toured the facility which was producing 1M masks per month.
- HVAC with ISO-8 level filtration
- electrical service | distribution
- lighting
- staff facilities
Holzer
Health Services, Jackson & Gallipolis OH
An ambulatory surgery center expansion at both the Jackson & Gallipolis facilities. Systems design spanned intake, imaging, PACU, OR & central sterilization.
- chilled water with UV light air handler feeding the sterile operating areas and corridors
- OR pressure controls | monitoring for JACHO reporting
Ohio State
Hospital East, Columbus OH
Demolition design and engineering of plumbing, HVAC and electrical for the conversion of an existing clinical and office space to create a new 6000 SF occupational therapy suite.
- HVAC upgrades | air handler
- ADA restroom design
- telecommunications | data
- electrical service panels | lighting
Selby
General Hospital, Marietta OH
Design of plumbing, HVAC and electric for hospital renovation.
- sanitary, hot/cold water piping
- chemical waste piping
- life safety system
- new VRF system
- nurse call
Ohio Health
O’Bleness Hospital, Athens OH
Demo and design for reconfiguration and renovation of a hospital space for the addition of a new nuclear medicine imaging suite.
- HVAC | ductwork
- dedicated power
- additional oxygen and medical gas
- specialty lighting
Doan Hall
OSU Wexner Medical Center, Columbus OH
Multiple projects:
- feasibility study followed by the subsequent design to convert an existing space to a burn treatment facility using 100% outside air handling
- operating room HVAC renovation involving new air handlers and filtered air supply
- conversion of a lower level area to create a new CAT scan lab
Franklin Medical Center
Ohio Department of Rehabilitation & Corrections, Columbus OH
Multiple projects:
- study and electrical upgrades to correct voltage fluctuations in the main switchgear
- new electrical, piping/valve systems, vacuum systems and oxygen for in-patient medical facility serving 150 patient beds
- Mechanical room HVAC upgrades
Guernsey Health Systems
Southeastern Medical Center, Cambridge OH
Design of plumbing, HVAC and electrical for new 20,000 SF medical center.
- upgraded central VAV systems
- new X-ray lab
- new physical therapy pool
- specialty exam room wiring/power/data
Mercy Health
Springfield Regional Medical Center, Springfield OH
Design of plumbing, HVAC and electric for multiple renovation projects.
- radiology wing HVAC
- pharmacy HVAC and electrical renovations
- new TB isolation rooms
- central chilled water plant cross-connects
- boiler plant improvements
Centerburg
Dental Care, Centerburg OH
New 5000 SF dental clinic.
- specialty lighting
- specialty gas systems | distribution
- electrical | telecommunications | data
- new HVAC
- ADA restroom design
- life safety systems