EMPLOYEE SPOTLIGHT 2025 – Joshua Funk
This month we continue to celebrate the individuals that have made Kramer Engineers Company a success. To that end we want to highlight the accomplishments of Employee Spotlight 2025 – Joshua Funk. Joshua Funk is a seasoned engineer with 11 years of diverse experience in civil engineering.
A CAREER BUILT ON DIVERSE EXPERIENCE
Joshua Funk graduated from The Ohio State University in 2013 with a BS degree in civil engineering. After graduation, he launched his career with the Minnik & Smith Group, a full-service engineering firm. There he contributed significantly to various projects across the region.
Josh later expanded his design portfolio with other notable firms including Kabil Associates Inc., where he served as Site Civil Design Engineer and Project Manager. During his tenure he managed site civil design for a variety of projects:
- Gahanna Library: $19 million project, which involved replacing the existing library with a new 40,000-square-foot facility. Joshua Funk was involved in site design, traffic flow optimization, and utility coordination, ensuring the project met both aesthetic and functional goals.
- Hilltop Library: $11.5 million renovation and expansion project which involved replacing the existing library, reconfiguring the site entrance and parking lot layout and upgrading parking drainage facilities, with enhanced landscaping and stormwater control features.
- COTA McKinley (ODOT): $62 million renovation and building expansion project for the Central Ohio Transit Authority. The project required careful consideration of site constraints, including remaining fully operational during construction, extensive underground stormwater management facilities, and an additional expansive parking lot.
CURRENT ROLE AT KRAMER ENGINEERS
In June of 2022, Joshua Funk decided to make Kramer Engineers his new professional home. As a senior engineer in the civil engineering department, Josh’s expertise is the foundation for a wide range of projects:
- Vance Outdoors of Hebron: A new building addition and facility expansion project. Engineering involved upgraded asphalt parking lot, and modern sanitary and storm sewer systems. These features were designed to improve capacity and functionality.
- Adaptive Sports Connection: Development of a new building and expanded parking area designed to better serve people with disabilities. A comprehensive site and utility upgrades featured a new storm sewer system with an extended dry detention basin.
- TLE Pickerington: Overall site and utility improvements. Although the project included a modern storm sewer system with an extended dry detention basin and integrated a fire suppression system. Special consideration was also given to the landscaping plan not only to meet zoning requirements but to elevate the site’s overall aesthetic appeal.
- Columbus Equipment: Design of a building addition constructed to seamlessly expand the existing facility, matching its height and enhancing operational capacity. Strategic reconstruction and relocation of existing underground utilities to modernize the storm sewer system and extend the dry detention basin. Phasing played a critical role in the planning and development process to ensure minimal disruption to ongoing operations. Engineering also upgraded a gravel lot to a roller-compacted concrete surface with new curbing, boosting both durability and visual appeal.
EMPLOYEE SPOTLIGHT 2025 – Joshua Funk
Throughout his career, Joshua Funk has demonstrated a commitment to excellence in civil engineering. His diverse experience across a broad spectrum of projects has equipped him with a unique skill set, making him a valuable asset to our team.

Comments are closed.