EMPLOYEE SPOTLIGHT 2025 – Alex Robinson

This year we are celebrating those individuals that have helped shape 75 years of Kramer Engineers.  So next up we are featuring the accomplishments of Employee Spotlight 2025 – Alex Robinson. Since joining Kramer Engineers Company (KEC) in 2023 he has built a strong portfolio of civil infrastructure work.

EDUCATION & EARLY CAREER

Alex graduated from The Ohio State University with a B.S. degree in environmental engineering.  During his collegiate tenure Alex’s academic success was marked by multiple tours on the dean’s list; exemplifying his passion for his chosen field.

After graduation, Alex launched his career with Brown and Caldwell, focusing on environmental sector projects.  There, he honed his skills in GIS mapping, stormwater management, watershed modeling and regularly performed inlet protection research for ODOT.

Alex later broadened his civil skillset at Sands Decker, where he navigated the intricacies of site civil planning and utility design.  However, in early 2023, Alex Robinson decided to join Kramer Engineers Company’s civil team.  Now he engineers a broad spectrum of infrastructure projects across public, healthcare, and commercial sectors.

ROLE AT KRAMER ENGINEERS

Alex Robinson approaches every project with curiosity and dedication.  Therefore, his designs are a comprehensive map to clear buildable site solutions.  The following is just a sampling of high-profile projects that showcase Alex Robinson’s engineering skill:

  • OHIO DEPT OF CORRECTIONS: this project involves engineering design for replacement of a connector fence and gate located between Grafton Correctional and Grafton Reintegration Center.  This $4M project also involved design of stormwater upgrades, parking lot expansion and a new paved roadway.
  • CAPITAL ROYAL DAY CARE: This project involved site design for the installation of new parking and access drives.  Work included modifications to the roadway, and installation of site landscaping and screening for the conversion of a commercial retail site to a child day care facility. Engineered various pavement designs and striping plans, screening and landscaping plans, and general site zoning compliance.
  • RIVERSIDE PARK WATER PARK: This project involved site and stormwater design for the installation of a new water park facility in Mount Vernon, OH.  Work required  engineering of the water and electrical services, and stormwater management infrastructure within a floodplain as the site was adjacent to the river. 
  • LONDON CORRECTIONAL INSTITUTION: This $2M project repaving and new paving work at a correctional facility.  Engineering required pavement milling, standard and heavy-duty asphalt design, pavement restriping, stormwater infrastructure installation, ADA improvements, and lighting installation.